Highway 6 – Grey Rd to Ricardo Rd

Construction of a 2.3km highway realignment, intersection improvements, fish bearing Coldstream Creek enhancements

Highway 97

Nine kilometer addition to Highway 97 which includes two overpasses, two tunnel crossings and tie-ins to the existing Highway 97.

Leigh Road Interchange Phase 1b

Construction of the northbound off ramp, southbound on ramp and McCallum Road connection

NNTC Retaining Wall

Construction of the lot expansion for the new Canadian Tire building (currently the largest concrete block wall on Vancouver Island)

HWY 14 – Sombrio Bridge

Replacement of existing single lane bridge on Highway 14 near Port Renfrew with a 124 meter span stell girder two lane bridge for MOTI

Spencer Road Interchange

Construction to activate the new Spencer Interchange overpass and north bound on ramp and eliminate the left turn at Spencer Intersection.

McMillan Street Upgrade

Upgrades to underground infrastructure, surface works, traffic and pedestrian controls and landscaping to a 4 block urban arterial route

HWY 4 – Wally Creek / Lost Shoe Bridges

Bridge replacement for the Ministry of Transportation and Infrastructure.

McTavish Interchange

Redesigned McTavish Interchange on the Patricia Bay Highway for the Ministry of Transportation and Infrastructure.

HWY 4 – Mercer / Brayden

Bridge replacement for the Ministry of Transportation and Infrastructure.